KDK meter installation terminal, 63A, 1phase, 2 neutral conductors
XXX.XX
€/unit
Description • According to DIN VDE for energy-interruption-free electricity meter replacement for 1-phase connection up to 63 A • Overload current 100 A • 2 neutral wires • Solid, loss-proof TX25 connection screws • Tested and certified to DIN VDE 0603-3-3 • Design: Standard pin insert • Connectable conductor cross-section: 6 - 35 mm² • Design of the electrical connection: Screw connection Technical data
|
Products |